Home New Construct Remodeling Kitchens Finished bsmt Bathrooms Bldg. Seminars Building Video Lots for Sale Granite     

***G***

What we Do!

Privacy Statement

Instruction
for Site

Custom
Homes

RANCH
HOMES
Carleton
Subdivision

Cost
Sheets

Our Standard
Building
Package

Finance

Lot Purchase

Blue prints

Contracts

Engineering/
Plot plan

Permits

Building
Supplies

Insurance

Lot Prep

Tree
Removal

Building
Inspections

Gas Service

Electric/
Service

Septic

Well

City Water

City Sewer

Fireplaces

Excavation

Basement
Walls

Walk-out/
Basements

Backfill/
Rough Grade

Trenching/
Garage/Porch

Steel
Beams

Lumber/
rough pkg.

Windows/
Doorwalls/
Doors

Rough/
Carpentry/
Labor

Plumbing/
Materials

Plumbing/
Labor

Heating

Electrical

Alarms

Lights

Brick

Siding

Insulation

Drywall

Paint

Cabinets

Counter-tops

Appliances

Trim/
Material

Trim/Labor

Ceramic/
bathes-etc

Concrete
Drives-etc.

Sand
Gravel/Dirt

Garage Doors

Gutters

Decks

Trash-removal

House-cleaning

Floor/
Coverings

Hardware &
Shoe

Construction-heat&power

Winter-construction costs

The End

 

 

 

 

 

# of hits this page only Hit Counter

Building & Remodeling costs are the lowest they have been in 8 years!
Click here for more information

Buildahouse.gif (5012 bytes)

COST WORKSHEETS

 

HOME PLANS & ARCHITECTURAL FEES

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Home Floor Plan/Design        
 Architectural Fees        

LOT PREPARATION

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Water Tap Permit        
 Sewer Tap Permit        
 Sewer Benefit/Use Charge        
 Building Clean-Up Bond        
 Performance Bond        
 Plan Review        
 Engineering Review        
 Building, Heating, Plumbing &    Electrical        
 Soil Erosion Permit        

SUB TOTAL

       

ENGINEERING

Click Here to return to HOME PAGE

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Plot Plant        
 Survey        
 Basement Stake-Out        
 Final Grade Certificate        

SUB TOTAL

       

INSURANCE

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Building Insurance        

EXCAVATION

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Basement        
Copper        
 Sump Pump        
 Extra        

SUB TOTAL

       

BASEMENT WALL

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 7'10" High Basement Wall        
 Chimney        
 Basement Windows        
 Walkout Trench        
 Drop Ledges        
 Extra        

SUB TOTAL

       

42" FOUNDATION & BLOCK

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 l.f. 10 x 42        
 l.f. Block        
 l.f. Block Basement        
 Extra Concrete        
 Straps        
 Re-Steel        

SUB TOTAL

       

BACKFILL & ROUGH GRADE

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Backfill        
 Rough & Cut        
 Finish Cut        

SUB TOTAL

       

STRUCTURAL STEEL

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 I-Beam        
 Columns        
 Special        
 Shims Plate        
 Rerods        
 Wire Mesh        

SUB TOTAL

       

ROUGH LUMBER

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Dimensional        
 Trusses        
 Studio & Cathedral        
 Special Stairs        
 Loss Replacement        

SUB TOTAL

       

WINDOWS & DOOR WALLS

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

Wood Windows & Door walls        
Walkout Windows        
Aluminum Windows & Door walls        
Other        
 Loss Replacement        

SUB TOTAL

       

DOORS

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Front        
Service        
 Other        

SUB TOTAL

       

ROUGH CARPENTRY LABOR

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Labor - Rough        
 Labor - Special Costs        
 Labor - Extra Costs        

SUB TOTAL

       

ROOFING & FLASHING

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Roofing - Regular        
 Roofing - Special        
 Flashing        
 Skylights        

SUB TOTAL

       

PLUMBING

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Rough        
 Finish        
 Extra        

SUB TOTAL

       

ELECTRICAL

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

Rough        
Finish        
Fixture - Hardware        
Fixture - Labor        
 Extra        

SUB TOTAL

       

HEATING

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

Rough        
Finish        
Air Conditioning        
Kitchen Vent        
 Extra        

SUB TOTAL

       

BRICK STRUCTURES

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Bricks        

MASONRY MATERIALS & STONE

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Mortar        
 Sand        
 Flue        
 Block        
 Wall Ties        
 Clean-Out        
 Ash Dump        
 Damper        
 Lintels        
 Firebrick        
 Door Sills        
 Sliding Door Sills        
 Angle Iron        
 Basement Windows        

SUB TOTAL

       

MASONRY LABOR

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Labor for Masonry Work        

BRICK CLEANING

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Caulking - Special        

SUB TOTAL

       

COPPER / GUTTERS / SIDING

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Copper        
 Gutters        
 Vinyl Siding        

SUB TOTAL

       

SAND FOR FILL

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Fill Sand        

CEMENT - INTERIOR & EXTERIOR

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Basement Floor        
 Garage        
 Family Room        
 Bumpers        
 Steps        
 Visqueen        
 Approach        
 Driveway        
 Walk to Porch        
 Front Porch        
 City Sidewalk        
 Service Walks        
 Back Porch or Slab        
 Stone Steps        
 Machine Time        
 Extra - Labor        

SUB TOTAL

       

INSULATION

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 House        
 Walkout Walls        
 Perimeter        

SUB TOTAL

       

DRYWALL

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 House        
 Garage        
 Walkout        

SUB TOTAL

       

GARAGE DOORS

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Garage Doors        
 Garage Access Door        

SUB TOTAL

       

CERAMIC TILE

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Master Bath        
 Hall Bath        
 Powder Room        
 Foyer/Vestibule        
 Fireplace Hearth        
 Tub Platform        
 Garden Room Floor        

SUB TOTAL

       

INTERIOR TRIM MATERIALS

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Interior        
 Decorator        
 Extra        

SUB TOTAL

       

CABINETRY

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Kitchen Cabinets        
 Bath Cabinets        
 Extra        

SUB TOTAL

       

TRIM CARPENTER

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Labor        
 Decorator        
 Extra        

SUB TOTAL

       

FINISHING HARDWARE

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Finish Hardware        

PAINT - INTERIOR & EXTERIOR

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Base        
 Custom        
 Decorator        
 Extra        

SUB TOTAL

       

UTILITIES

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Natural Gas Supplier Connection        
 Electric Supplier Connection        

COUNTERTOPS & LAMINATING

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Countertops        
 Extra        
 Decorator        

SUB TOTAL

       

MIRRORS & SHOWER DOORS

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Mirrors        
 Mirrors - Decorator        
 Shower Door        
 Extra        

SUB TOTAL

       

FLOOR COVERINGS

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Vinyl        
 Carpet        
 Hardwood Floors        
 Ceramic Tile        

SUB TOTAL

       

APPLIANCES

ESTIMATE OF COST

BASE

EXTRAS

MISC.

TOTAL

 Range        
 Oven        
 Dishwasher        
 Refrigerator        
 Microwave        
 Hood Fan        
 Extra        

SUB TOTAL

       

MISCELLANEOUS EXTRAS

MISCELLANEOUS

BASE

EXTRAS

TOTAL

 SHOE & HARDWARE      
 MISC. LABOR - CLEAN-UP      
 MISC. CONSTRUCTION COSTS      
 HOUSE CLEANING      
 CONSTRUCTION HEAT & POWER      
 WINTER CONSTRUCTION COSTS      
 PRE-FAB FIREPLACE      
 TREE FEE      
 RUBBISH REMOVAL      
 CONTINGENCIES      
 INTEREST      
 EXTRA      

YOUR ADDITIONAL EXTRAS

ADDITIONAL EXTRAS

BASE

EXTRAS

MISC.

TOTAL

         
         
         
         
         
         
         
         

SUB TOTAL

       

YOUR NEW HOME WILL COST APPROXIMATELY...

 TOTALS

          Thank You for Visiting
If you are building or remodeling in Michigan call Bob Gerich at 313 670-7888 for a bid on your project. 

        WE DO.....

  • New Construction - We will take you through whatever stage you need to get too.

  • Remodeling - includes pretty much anything you can think of

  • Additions - we specialize in dormers and additions to the side of your home

  • Kitchens - go to our sections on kitchens and you can see some of our work

  • Bathes - we only do Custom bathes with specialty products installed

  • Shingles - we have licensed and trained roofing people and we specialize in 35 and 40 year architectural shingles.

  • Windows - we only install upgraded windows such as Anderson 400 Series, Koelbe & Koelbe windows, Pella and other competitive brands.

  • Finished Basements - we only work on finished basements if you allow us to pull permits. 

Click here to Return to Home Page

Click here for information on building or remodeling in Plymouth and surrounding areas.  

 

Send mail to rgerich@buildahouse.com with questions or comments about this web site.
Copyright © 1998 Your New House Bldg. Co