Home New Construct Remodeling Kitchens Finished bsmt Bathrooms Bldg. Seminars Building Video Lots for Sale Granite     

***G***

What we Do!

Privacy Statement

Instruction
for Site

Custom
Homes

RANCH
HOMES
Carleton
Subdivision

Cost
Sheets

Our Standard
Building
Package

Finance

Lot Purchase

Blue prints

Contracts

Engineering/
Plot plan

Permits

Building
Supplies

Insurance

Lot Prep

Tree
Removal

Building
Inspections

Gas Service

Electric/
Service

Septic

Well

City Water

City Sewer

Fireplaces

Excavation

Basement
Walls

Walk-out/
Basements

Backfill/
Rough Grade

Trenching/
Garage/Porch

Steel
Beams

Lumber/
rough pkg.

Windows/
Doorwalls/
Doors

Rough/
Carpentry/
Labor

Plumbing/
Materials

Plumbing/
Labor

Heating

Electrical

Alarms

Lights

Brick

Siding

Insulation

Drywall

Paint

Cabinets

Counter-tops

Appliances

Trim/
Material

Trim/Labor

Ceramic/
bathes-etc

Concrete
Drives-etc.

Sand
Gravel/Dirt

Garage Doors

Gutters

Decks

Trash-removal

House-cleaning

Floor/
Coverings

Hardware &
Shoe

Construction-heat&power

Winter-construction costs

The End

 

 

 

 

 

 

City Water


Click on Picture to enlarge

The above picture shows you a city copper water pipe coming in where the basement floor will be.  It also has (the white pipe) city sewer right next to it. 

The water and sewer tap permits in Michigan are quite high.  At least they are high in my thinking process.  When you are putting in a well and septic you have an offset in permit pricing.  The bottom line to this is you won't have a water fee and sewer fee of say  five or six thousand dollars so in a sense this money goes toward your cost of installing a well and septic.  Which is a good thing.

Our excavator installs the city water line and the city sewer line. .  It comes in the pricing structure of the overall bill.  Be careful when you are getting bids to get everything you are going to need. 

Our excavator digs the basement and runs a 60 ft. water line unless you need more footage to get to where you want the water line to come up through the basement floor.  You need to plan this ahead of time because the copper line should be continuous and not spliced together. Don't put the water line to close to the wall because you still need room to hook it up. 

Click here to return to home page

 

 

Send mail to rgerich@buildahouse.com with questions or comments about this web site.
Copyright © 1998 Your New House Bldg. Co